Cold Box Structural Steel - Moreno Valley, CA
Market - EDUCATION
SERVICES RENDERED
-
Created 3D model for coordination and fabrication
-
Fabricated structural components and applied HDG finish
-
Shipped from Orange County to Moreno Valley, CA
-
Scheduled for Fall 2025
PROBLEM-SOLVING & ADAPTABILITY
After approval of shop drawings this project was fabricated and finish coated. At that point the design and coating system changed. We worked with the contractor to redesign 60% of the fabricated components and switch to a galvanized finish product.
Installation: Coming soon
Completed the project on budget
Project Summary
MMJ Construction engaged us to fabricate and install structural steel for a commercial-sized 1,600 sqft walk-in freezer for the Moreno Valley Unified School District. Our team developed complete shop drawings for review and approval by all relevant parties. Once approved, we fabricated all components in-house and coordinated with a local shop for the application of protective coatings. Following coating completion, we performed the on-site erection of the steel structure.

- CONTRACTOR: Moreno Valley Unified School District
- CLIENT NAME: MMJ Construction